Requirement :
|
Maintenance of plant mechanical equipment, annual preventive maintenance (apm) & load testing of chain pulley block / manual hoist and other material handling equipment, shifting and erection of l-45 /5000 hmt make lathe machine, shifting and erection of nh- 32-3000 / nh-22-2000 hmt make lathe machine, shifting and erection of hmt make radial drilling / milling machine, shifting and erection of shaper machine/ surface grinder/ power hacksaw, lifting/ shifting of pump, valves, motor, strainer, damper, stop log gate, mechanical structures, assembles etc in rapp-7&8 area, maintenance of shutdown cooling pump, moderator pump, shifting, erection & dismantling of scaffolding, cleaning / replacement of filters of ventilation system of length upto 70 0mm and width upto 500mm, strainer/ filter cleaning of mechanical system, de coupling and coupling of mechanical equipment, maintenance of shutter.
|