Requirement :
|
Check survey, design, optimization, fabrication, proto assembly before mass fabrication, testing, galvanization and supply of 220 kv, multi circuit towers, acsr panther conductor, 48 fibre opgw, hardware fittings, polymeric insulators etc. transportation, insurance, storage and handling of all the material required for the construction of line, excavation, foundation casting, revetments, tower erection, stringing and sagging, testing and commissioning of the 132 kv, jamta to kala amb transmission line on double ckt and multi-circuit towers to 220 kv sub-station proposed at andheri by hpptcl on turnkey basis
|