Requirement :
|
General & site facilities, earthwork on road embankment, widening of existing pavement (5.50m to 7.30m), strengthening of existing pavement (5.50m), surfacing (dbs base & dbs wearing course) (7.30m), construction of hard shoulder (2x1.50m), curve straightening, re-construction of 1 no rcc box culvert at 4th km, construction of saucer drain, protective work (rcc plate palisiding), traffic sign, sign post, guide post, km post, road marking & tree plantation from ch. 0+000m to 10+000m of magura-narail (r-720) regional highway under road division, magura during the year 2019-2020.
|