Requirement :
|
General & site facilities, earthwork on road embankment, widening of existing pavement (5.50m to 7.30m), strengthening of existing pavement (5.50m), surfacing (dbs base & dbs wearing course) (7.30m), construction of hard shoulder (2x1.50m), curve straightening, new construction of rcc box culvert at 11th km, re-construction of rcc box culvert at 13th km, construction of rcc box culvert at 17th km (3 nos), construction of saucer drain, protective work (rcc plate palisiding), traffic sign, sign post, guide post, km post, road marking & tree plantation from ch. 10+000m to 21+200m of magura-narail (r-720) regional highway under road division, magura during the year 2019-2020.
|