Requirement :
|
Planning, engineering, designing & drawing and supply, installation, testing and commissioning of controlling arrangement valves / specials for existing 900 / 1000 mm dia GRP pipe line from F.P.S to kantiyajal B.P.S. Planning, engineering, designing & drawing and Supply, Installation, Testing and commissioning for 900 mm Dia. PCCP pipeline parallel to the existing 900 mm dia GRP pipe line and Interlinking (in a piecemeal) with existing 900 mm Dia. GRP pipe line from F.P.S to Kantiyajal B.P.S
|