Requirement :
|
Supply of Liquid Chlorine to CTPP. Repairing and Retubing of High Pressure Heater-5 for 250MW unit of Thermal Power Plant. Annual contract for Routine, Breakdown and Capital Maintenance of Bottom Ash Handling System of Unit 1 to 4, (4X250MW), Stage-I, Phase-I&II, CTPP Annual contract for routine, breakdown, capital maintenance and providing assistance in operation of dense phase Dry Fly Ash Handling system of Unit 1 to 4 (4x250MW), Stage-I, Phase-I&II, CTPP Annual contract for the work of routine operation in shift and routine/capital/breakdown maintenance work of 6.6KV SWGR of main plant area, maintenance of SPBD, cable laying and termination work, O&M of lift and elevators of unit I to IV (4X250 MW) Phase-I & II of Stage-I, CTPP Erection, Commissioning and testing of pump with motor and pipeline laying at plant exit point of storm water pit (sluice gate pit) and pump with motor and pipeline laying at drain pit at Unit 4 to seal trough of Unit 3&4, CTPP. Annual contract for the work of sample collection, testing, solution preparation, transportation of various chemicals, chlorine gas tonners, assistance in operation work and other Misc. work of chemical division at Stage-I, Phase-I&II, CTPP Annual work contract of Stack/Ambient Air Quality Monitoring, Meteorological Data monitoring and Trade Effluent Analysis at Stage-I, Phase-I&II (Unit 1 to 4), CTPP (O&M). Annual contract for routine, breakdown and capital maintenance work of effluent treatment plant and all connected effluent supply pits and upkeep the area of Unit 1to4, 4X250MW Chhabra Thermal Power Project, Stage-I Annual contract for routine/capital/ breakdown maintenance work of 4x750 KVA DG set of Unit 1 to 4, Electrical system of ESP and soot blower of 4x250MW unit 1 to 4 and general area and equipment cleaning of electrical system of ESP & soot blower of Unit 1 to 4, 4x750KVA DG sets and AC & Ventilation system of ESP Unit 1 to 4 of CTPP. Annual contract for the work of routine breakdown and capital maintenance work of LT switchgear, LT bus duct, Ash handling plant control panel, battery bank and battery charger, all CA area LT panels, cable laying, glanding, jointing and termination and cable cleaning of Unit 1 to 4, CTPP.
|