Requirement :
|
Hiring of hemm for re- handling of ob from quarry 04 of aadocm of dhori area . re-handling of ob – hiring of hemm for re-handling of ob(from quarry 04 of aadocm) for all kinds of soil/ rocks (consisting of top soil, alluvium soil, blast rock, etc) including excavation of ob, loading & transportation of excavated ob, dumping in dump yard, dozing, grading, leveling at dump sites including face & other specified places, preparation & maintenance of haul roads & dewatering of working faces, water sprinkling on haul road as per instruction of the engineer-in-charge of aadocm.
|