Requirement :
|
Establishment of sheikh lutfar rahman dental college,gopalganj(1st revised) sub-head supply and installation of generator, electric substation equipment (1000 kva), centrifugal pump motor set, solar panel, air conditioning system, pabx, cctv, conference/pa system etc.
|