Requirement :
|
a) construction of rcc precast compound wall, laying of paver block roads and rcc side drains, supply and erection of steel trusses for sheds (3nos), providing highmast arrangements for the solid waste disposal centre at sipcot it park, siruseri, b) construction of 3m vent rcc box culvert at the entrance of sipcot information technology park, siruseri, c) providing barbed wire fencing with precast rcc posts arrangements to safeguard the avenue plants to be planted in the osr areas at sipcot industrial complex, cheyyar, d) construction of rcc precast compound wall, laying of paver block roads and pcc side drains, supply and erection of steel trusses for sheds (3 nos) and providing street light system for the solid waste disposal centre area at sipcot industrial complex, cheyyar.
|