Requirement :
|
Providing new construction from ch.1+300m to ch. 1+480m, ch.5+350m to ch. 5+600m & ch.6+420m to ch.6+720m, widening of pavement from ch. 0+400m to 1+300m, ch. 1+480m to 5+350m, ch. 5+600m to 6+270m & ch. 6+720m to 8+000m, rigid pavement from ch.0+000m to 0+400m & ch.6+270m to 6+420m, strengthening the existing pavement with surfacing by dbs-base course, dbs-wearing course, 3(three) nos rcc box culvert & providing sign-signal, km post, guide post, protective works at different km of tekerhat-gopalgonj(horidaspur)-mollahhat(gonapara) road (road no.r-850) under road division, gopalgong during the year 2020-2021. (package no.pw-01).
|