Requirement :
|
New construction from ch.26+030m to ch. 26+230m, ch. 26+280m to 26+380m & ch. 27+950 to 28+100m, widening of pavement from ch. 24+000m to 26+030m, ch. 26+230m to 26+280m, ch. 26+380m to 27+700 & ch. 28+100m to 32+000m, rigid pavement from ch.27+700m to 27+950m, strengthening the existing pavement with surfacing by dbs-base course, dbs-wearing course, 1(one) nos rcc box culvert & providing sign-signal, km post, guide post, protective works at different km of tekerhat-gopalgonj(horidaspur)-mollahhat(gonapara) road (road no.r-850) under road division, gopalgong during the year 2020-2021. (package no.pw-04).
|