Requirement :
|
New construction from ch.10+200m to ch. 10+300m, ch.12+375m to ch. 12+525m & ch.13+080m to ch.13+400m, widening of pavement from ch. 8+000m to 10+200m, ch. 10+300m to 12+375m, ch. 12+525m to 13+080m & ch. 13+400m to 16+000m strengthening the existing pavement with surfacing by dbs-base course, dbs-wearing course, 3(three) nos rcc box culvert & providing sign-signal, km post, guide post, protective works at different km of tekerhat-gopalgonj(horidaspur)-mollahhat(gonapara) road (road no.r-850) under road division, gopalgong during the year 2020-2021. (package no.pw-02).
|