Tender Detail

Buyer/Seller : Can be viewed by Subscribers
Ref. Number : 44034520 Tender Number : 2021_Coop_65431_1 Tender Prod. No : 2021_Coop_65431_1
Requirement : Major and general jobs - fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 1050mm, dismantling, fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 900mm, dismantling, fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 720mm, dismantling, fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 620mm, dismantling, fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 520mm, dismantling, fabrication and erection of distance piece of vapour pipe length up to 1.5 mtr. dia- 420mm, dismantling of ms/ci condenser cone of pans , fabrication of ms condenser cone of pans , erection of ms/ci condenser cone of pans , dismantling, fabrication, erection of umbrellas of pan save all as per Existing design including all Supporting., replacement of worn out portion of bottom, side plate & Supporting angle/channel of syrup and molasses tank at pan station , replacement of m.s plate gutter of crystallizer station and other factory units. , replacement of worn out portion of pan soucer, dismantling, fabrication and erection of downtake of pan from 10/12mm plate, dismantling, fabrication and erection distributor of pans, dismantling, fabrication & erection of worn out portion of molasses conditioner. this Work includes dismantling and erection of all Connection pipes and their drive unit., dismantling, fabrication and erection of worn out bottom portion of crystallizer , fabrication and erection of catcher for c-vacuum crystallizer., replacement of crystallizer arms along with Supports from 75x75mm m.s angle. a) dismantling , replacement of crystallizer arms along with Supports from 75x75mm m.s angle. b) fabrication , replacement of crystallizer arms along with Supports from 75x75mm m.s angle. c) errection , dismantling, fabrication & erection of cooling coils of crystallizer including all Connections., dismantling and erection of branch pipes of spray pond. this Work include all Connections of clusters,, dismantling of ci/ms main pipeline spray pond , dismantling fabrication & erection of suction pipes of injection pumps with stainer., dismantling fabrication & erection of suction pipes of spray pumps with stainer., erection and Commissioning of magma mixture complete ( pump , reduction gear pipeline). fabrication of beds and including all Connections., dismantling ,fabrication erection of worn out bottom half portion of b magma mixture including all Connections., dismantling, fabrication and erection of worn out bottom half portion of a pug mill including all Connections., dismantling, fabrication and erection of worn out portion of sugar hopper along with its alignment. size 4’ wide x 2 mtr length, dismantling, fabrication and erection of sugar melter pump stainer including all Connections, fabrication and erection of bed for pump and motor of magma mixture along with suction and Delivery pipe line Connections, alignment of motor with pump etc., modification of bagacillo screen for easy Operation with fitting of ball bearings, wheels & guides in all respects., dismantling, fabrication and erection of bottom discharge chute of continuous centrifugal machine, fabrication and erection of new syrup tank at pan station including all Connections., dismantling, fabrication and erection of ammonia coils of pans from ms pipe dia 3” including all Connection, dismantling and erection of tube plate (top and bottom) 2nd evaporator body including fabrication and erection of downtake including all Connections., dismantling and erection of tube plate(top and bottom) of pan no. 1 including all Connections along with fabrication and erection of downtake and dismantling a& erection of distributor ., fabrication and erection of beds for pump and motor etc., dismantling and erection of crystallizer shaft including arms and all Connections, fittings., dismantling, fabrication and erection of Internal plates of catcher for semi kestner, dismantling and erection of fabricated globe valve 30 “ in exhaust line of vapour cell., dismantling, fabrication and erection of quad body shell including all Connections. , cane cutter hoods from 8-10mm thick plate with ms angles etc. dismantling, fabrication and erection , dismantling, fabrication and erection of expansion joint of power turbine exhaust line from ms plate., replacement of side plates of cane carrier chain/ rbc and trough of rbc /bagasse elevator., replacement of channel and i-beam of rbc/ cane carrier/ bagasse elevator/ cross rbc runner, dismantling, fabrication erection of juice tray of mill no. 3 from ss/ms plate, fabrication of screw conveyor of mill house, dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion. (cone tapper portion size 15” approximate) , dismantling, fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection. , Repair of rotary bagasse feeders of boilers, body, Repair of rotary bagasse feeders of boilers, rotor, replacement of side plate 3mm/old ms plate of boiler (with ms plate & Supporting angle/ flat), dismantling, fabrication & erection of worn out ducting of boiler & apcd including angle, channel, flats & flanges , dismantling, fabrication & erection damper of boiler ducting, dismantling fabrication & erection of expansion joint of boiler ducting (3.360 mtr x 1.260 mtr), replacement of ms gutter of apcd plant from wet scrubber to ash pits, dismantling fabrication & erection of damper of rotary bagasse feeder, dismantling, fabrication & erection of worn out portion of id and apcd fan casing , replacement of sieve plates of apcd scrubber. this job also includes 10/12mm holes (324 holes per square ft.) drilling in plates , baffle plates (ms flat 65 x 6mm) of demister in wet scrubber , Repair/ replacement of wornout portion of wet scrubber of boiler no. 1 & 2 , dismantling fabrication and erection of receiving tank/ sum tank/ sealing tank of wet scrubber., replacement of g.i sheet gutter of factory Building, fabrication and erection (general), replacement of worn-out of m.s. runner of inter carrier, elevator, rbc , cross carrier & cane carrier chains,, patch Work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter , dismantling of sluice valve/ angle valve/ n.r.v. , erection of sluice valve/ angle valve/ n.r.v. ,butterfly valve, replacement of rail line of cane unloader with 50mm square bar , replacement of feed box of pans including all Connections.

Key Values

Closing Date : 27/05/2021
Document Sale To : 27/05/2021
Location : Punjab - India

Value Added Services

  • Get consortium partner
  • Get Winning Estimate
  • Track Tender Result
  • Get Subcontractors
  • Find Liaison Agency
  • Ask Expert

Disclaimer : Tender Tiger takes all possible care to ensure accurate & authentic tender information however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before they take submit their actual bid.