Requirement :
|
Provision Of Labor, Materials, Equipment And Other Incidentals Needed For The Establishment Of Solar-powered Fertigation System (spfs-32) In Brgy. San Marcos, Dingras, Ilocos Norte. Mobilization and demobilization 1.00 l.s. Construction of temporary facility 1.00 l.s. Clearing and grubbing 300.00 sq.m. Earthworks 114.74 cu.m. Rsb works 2,318.32 kgs. Form works 1,110.00 bd.ft. Concrete works 28.00 cu.m. Pv module and mounting 26,880.00 watts. Water pump 1.00 unit. Pump controller/ inverter 1.00 unit. Iron, tinsmithry & carpentry works 1.00 lot. Cable and electrical works 1.00 lot. Distribution works 20.00 m. Masonry, painting & water proofing works 61.00 sq.m. Dewatering works 1.00 lot. Doors and windows 21.50 sq.m. Stone masonry works 59.30 cu.m. Fertigator with tank 1.00 lot.
|