Requirement :
|
Cleaning cwr, sr, glr div. cleaning of ground water reservoir ( glr's) of below mentioned capacity including removal of all silt from reservoir, scrapping of wall, disinfection of reservoir after cleaning and disposal of silt up to 1.00 km lead and painting the date of cleaning on the reservoir. cleaning of clear water reservoirs ( cwr's) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 km lead and painting the date of cleaning on the reservoir. cleaning of over head service reservoir ( ohsr ) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 km lead and painting the date of cleaning on the reservoir. replacement of existing wire mesh on ventilators of glrs, ohsrs, cwrs etc. with 16 mm dia ms vertical bars placed at 10 cms wherever required, having 16-gauge wire mesh with a inner base of expanded jali welded around with vertical bars taking out with care the m.s. iron ladder fixed at ohsr , repairing, welding etc and fixing back at reservoirs including all labour and material replacement of existing copper float dia 300 mm and iron counter weight for water level indicator.
|