Requirement :
|
Work of replacement of coal pipes & p. f. elements during aoh at 500 mw, tps. annual contract for maintenance of main plant lighting, street lighting lt motor maintenance overhaul & allied works, cable laying work of main plant & odp for em2 at unit-s (500 mw) tps. work of replacement of damaged stringer channel of gantry, removing, shifting & lifting of suspended magnets and replacement of rollers of belt conv. 6a& 6b in chp-i tps. procurement of various chemical consumables. procurement of esp station control valve's complete assembly (type-1052) including valve actuator, positioner and controller for ahp-i. supply of fire hose reel complete with all accessories for tps. work of complete refurbishment / revamping and reconditioning of damaged gearbox for stacker / reclaimer and belt conveyor system in chp-i, tps. annual work contract for dozing the stacked coal properly in coal piles round the clock & other related miscellaneous emergency works at tps. annual work contract for assistance to carry out various electrical maintenance works of coal handling plant-i (500 mw) tps. providing & applying epoxy painting to the acid & alkali storage tanks, acid measuring tank and dm storage tank at wtp-500 mw tps.
|