Drilling, excavation, loading, transportation, dumping, spreading & levelling, etc., of 131.708 lbcm of in-situ ob (which includes 1.341 lbcm of top soil, 117.081 lbcm of hard ob & 13.286 lbcm of coal), excavation of 4.377 lbcm of top soil from external dump area and re-handling of 0.742 lcm loose ob & top soil with conventional equipment and additional works viz., 500 shovel hours & 5500 rmt of drilling at jvr oc-ii mine, kgm area during a period of 15 months. at Telangana, India
Classified in :
#Transportation
#Loading
#Drilling
#Excavation
#Handling Service
#Shovel Hiring
#Soil Leveling
Key Values
Worth | : | ₹ 675660000.0 |
EMD | : | Refer Document |
Doc Fees | : | ₹ 29500.0 |
Key Date
Due on | : | 25-May-2022 |
Days to go | : | -1133 Days |
Opening on | : | 25-May-2022 |
Published on | : | 13-May-2022 |
Key Location
Location | : | Telangana,India |
Address | : |
![]() |