Requirement :
|
Consultancy services for preparation of detailed project report, field survey, general report, basic drawing, technical report, detailed drawing, detailed cost estimate for the work comprehensive development of roads, drains and other works in ward no.67 & 102 (package-3) in mahalakshmipuram division, est cost 2192.00 lakhs
|