Requirement :
|
Supply of process equipment and cryogenic vessels nda. design, fabrication, testing, qualification and supply of lox, cooler (tag no. he-9001) to sdsc shar, design, fabrication, testing, qualification and supply of gaseous, helium cooler (tag no. he-9002) to sdsc shar, design, fabrication, testing, qualification and supply of, accumulator (tag no. a-9002) to sdsc shar, design, fabrication, testing, qualification and supply of drain, tanks (tag nos. t-9003, t-9004, t-904) to sdsc shar, design, fabrication, testing, qualification and supply of drain, tank (tag nos. t-903) to sdsc shar, design, fabrication, testing, qualification and supply of, evaporator (tag no. e-9001) to sdsc shar, design, fabrication, testing, qualification and supply of, pressure build-up units (tag no. e-901 & 902) to sdsc shar, grand total cost (including transportation, tpia, gst & cdec, as applicable) (in lakhs) (inr).
|