Requirement :
|
Manufacture/ fabrication, assembly, inspection, testing, painting, delivery, unloading, storage, erection, testing, trial run, and commissioning of spillage coke chain conveyor & skip hoist and detail engineering, preparation and submission of detail engineering drawings, manufacture/ fabrication, assembly, inspection, testing, painting, delivery, unloading, storage, erection, testing, trial run, and commissioning of reciprocating guide type mechanized coke loading arrangement at wharf (package no. se-016).
|