Requirement :
|
Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia to75 mm hdpe pe-100 , pn-6 pipe 7687 m length valve specials and all fittings including all allied civil works, supplying & installation of energy efficiant pump isi marked required capacity three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe,ss/nylon wire rope and connection cable including verification of tubewell yield& electric connection from cseb, construction of switch room size 1.20x1.20x2.10 m. 25 nos, electro chlorination system, provision for supply & installation of hdpe tank of 02 no x 5000 liter ( total-10000 liter) capicity & 12 m gi/steel structure 01 nos, provision for supply & installation of hdpe tank of 02 no x 5000 liter ( total-10000 liter) capicity &9 m gi/steel structure 11 nos, information board, providing functional household tap connection(f.h.t.c) in individual households and government instiution etc. complete with trial run three month and operation & maintanance for 06 months under retrofitting piped water supply scheme under jal jeevan mission for village- fulpur , shankarpur, durgapur and tilwandand block- baikunthpur, district – korea.
|