Requirement :
|
Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia to75 mm hdpe pe-100 , pn-6 pipe 18633 m length with suitable joints valve specials and all fittings including all allied civil works, supplying & installation of energy efficiant pump isi marked required capacity three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe,ss/nylon wire rope and connection cable including verification of tubewell yield& electric connection from cseb, construction of switch room size 1.20x1.20x2.10 m. 21nos, electro chlorination system, construction of chlorinator room size 2.40 x 2.40 x 3.00 m. 08 nos provision for supply & installation of hdpe tank of 02 no x 5000 liter ( total-10000 liter) capicity & 12 m gi/steel structure 05 nos, construction of 10kl/05m 01 no staging over head tank, construction of dugwell 08 nos providing functional household tap connection (f.h.t.c) in individual households and government instiution etc. complete with trial run three month and operation & maintanance for 06 months under single village piped water supply scheme under jal jeevan mission for village- jagatpur and lotanpara block- baikunthpur, district – .
|