Construction of 2 lane 386 mtr span (260 plus 63 plus 63) extradosed bridge over river siang at design km 2.908 and 63.50 mtr span major bridge at design km 2.590 in bet km 118.8 junc of nh - 513 with yingkiong to moying vill junc at km 93.50 on at Pasighat,Arunachal Pradesh,India
Key Values
Worth | : | 1183500000.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 28-Jul-2023 |
Days to go | : | -655 Days |
Opening on | : | 01-Aug-2023 |
Published on | : | 25-Mar-2023 |
Key Location
Location | : | Pasighat,Arunachal Pradesh,India |
Address | : |
![]() |