Replace Pipes Of Water Cooling System And Fire Quench Foam At Oil Terminal Shomal (neka) at Iran
Classified in :
#Air Conditioner Repair
#Ahu Repair
#Fire Alarm Repair
#Air Cooler Repair
#Fire Detection System Repair
#Fire Alarm Panel Repair
#Air Circulator Repair
#Fire Engine Repair
#Fire Alarm System Repair
#Fire Brigade Repair
#Air Cooling Plant Repair
#Air Cooling System Repair
#Fire Equipment Repair
#Fire Alarm Maintenance
#Air Conditioner Maintenance
#Fire Alarm System Maintenance
#Air Conditioning Equipment Maintenance
#Fire Detection System Maintenance
Key Values
Worth | : | 95685972066.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 13-Jun-2023 |
Days to go | : | -698 Days |
Opening on | : | 13-Jun-2023 |
Published on | : | 20-May-2023 |
Key Location
Location | : | Iran |
Address | : |
![]() |