The Design And Construction Of A 4,300 Metre Force Main Effluent Pipe For The South Coast Sewage Treatment Plant at Barbados
Classified in :
#Drinking Water System Repair
#Sewerage Line Construction
#Sewage Construction
#Gi Water Line
#Sewerage Lines
#Sewerage Laying
#Sewerage Maintenance
#Drinking Water Distribution
#Sewerage Work
#Sewerage Network
#Drinking Water Scheme Repair
#Gravity Main
#Sewerage Pipe
#Drinking Water Facility
#Rcc Sewer Line
#Sewerage Line Laying
#Gi Water Pipeline
#Gravity Main Laying
#Drinking Water Pipeline Repair
Key Values
Worth | : | Refer Document |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 18-Jul-2023 |
Days to go | : | -717 Days |
Opening on | : | 18-Jul-2023 |
Published on | : | 02-Jun-2023 |
Key Location
Location | : | Barbados |
Address | : |
![]() |