Requirement :
|
Hiring of HEMM (Excavators, Tippers, Dozers, Motor - Graders, Water Sprinklers, and other allied equipments) for excavating Sub - Work 1(A) Soft Soil (Rehandling of OB) (not requiring drilling) above LK seam; loading into Tippers, Transportation and unloading the excavated material and silt; dumping, dozing, scraping/removal of all bands, Preparation / maintenance of haul road, water sprinkling and spreading of material at the site shown in the plan and as per the directives of the Management/ Engineer in - charge of Gevra OC Exp Project for a quantity of 12, 49, 857 Cum for a period of 240 day. Qty 1
|