D-1107:construction Of Rcc Pipe Drain And Footpath Starting From Bangladesh Agriculture University 1st Gate To Shes Mour Via Kbi Road((r/s Rail Bridge To Bau 1st Gate 900mm Dia Pipe, Length=1000m, L/s at Bangladesh
Classified in :
#Footpath
#Walking Track Repair
#Cc Footpath
#Catwalk Repair
#Drainage Channel
#Drainage Crossing
#Drainage Scheme
#Drainage Network
#Footway
#Drainage Pipeline
#Drainage Rehabilitation
#Drainage Pipeline Replacement
#Interlocking Footpath
#Drainage Connection
#Foot Path Repair
#Footpath Improvement
Key Values
Worth | : | Tk 3128000.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 07-Dec-2023 |
Days to go | : | -521 Days |
Opening on | : | Refer Document |
Published on | : | 10-Nov-2023 |
Key Location
Location | : | Bangladesh |
Address | : |
![]() |