Pre-Qualification : |
Minimum Average Annual Turnover of the bidder (For 3 Years) (3 ) : 210 Lakh (s) OEM Average Turnover (Last 3 Years) ( 3 ) : 210 Lakh (s) Years of Past Experience Required for same similar service : 3 Year (s) MSE Exemption for Years of Experience and Turnover : No Startup Exemption for Years of Experience and Turnover : No Document required from seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Past Performance : 80 %
|
Requirement :
|
Supply of Computer Science and Engineering Lab Modular Workstation Table and Chair for Students , One Set of High Back Revolving Chair with Faculty Table , Visitor Chair , Full Sized Closed Steel Almirah with Lock , Open Racks , Desktop , 20kva Online Ups , Switch , 2 Ton Split Air Conditioner with Stablizer , 75 Inch Interactive Panel with Ops , Software Antivirus for Desktop , Software Microsoft Office Ltsc Standard 2021 , 4mp Ip Dome Camera , 8
channel Nvr with 2tb Hdd , 8 Port Poe Switch , Cat6 Utp Cable Box 305 Mtr , Cat6 Utp 48 Port Patch Panel , Cat6 Information Face Plate with Keystone , Cat6 1 Mtr Patch
cord , Cat6 2 Mtr Patch Cord , 12u Rack with Accessories , Supply of Pvc Conduit Pipe 32mm for Computer Wiring and Power Wiring Per Mtr , Supply of Flexible Pvc Pipe 40mm
per Mtr , 2.5mm 3 Core Electric Lead Wire Bundle 100mtr for 34 Points Including Desktop and Tft , Supply of 6 Ampr Dual Modular Socket Plug with on Or Off Switch , Supply Of
63ampr Mccb Box with 3 Nos 63ampr Mccb , Supply of 32ampr Mccb Box with 5 Nos32ampr Mcb , Supply of 10mm Copper Wire for Ups Input Or Output 90mtr , 4mm 3
core Copper Wire for Ac Wiring 100 Mtr , Supply of 6 15 Ampr Power Mcb Switch for Ac , Laying of Pvc Conduit Pipe for Power Cable and Utp Cable , Laying of Power Cable And
utp Cable Within the Supplied Casing Capping and Modular Table , Patch Panel Punching , Connection of Power Lead Wire in Power Socket , Punching of Utp Cable in I O Box ,
installation of Ac with Required Copper Wire and Drain Pipe , Installation of I O Box on Table , Installation of Power Socket Box 3 Phase I O Online Ups Connection , Installation
commissioning of Lab Including Numbering of Nodes. Qty 1488
|