Supply of end wall construction assly.complete fitted alongwith shuttercomplete to drg.no. 2 10113.0.76.300.012 for lhb coaches. the exterior of end wallshall be without buldges or depressions that might appear after painting. theconcavity and convexity shall be less then 1.5mm in length of 2.5 meter and in thisproportion for shorter length. as per drg.no. 1 10113.0.20.120.001 alt "g" mfg.elgbltdoc.no.except para 2.3.1 of mdst-102 rev-01, packing instruction - pi100, protection procedure -wi100100, quality plan - n.a as per drg.no. 1 10113.0.20.120.001 alt "g" mfg.elgblt doc.no.excspecn 1 10113.0.20.120.001 alt "g" mfg.elgblt doc.no.except para 2.3.1 of mdst-102 rev-01
Supply of end wall construction assly.complete fitted alongwith shuttercomplete to drg.no. 2 10113.0.76.300.012 for lhb coaches. the exterior of end wallshall be without buldges or depressions that might appear after painting. theconcavity and convexity shall be less then 1.5mm in length of 2.5
Painting Work Tenders, Rail Accessories Tenders, Wall Tenders, Window Tenders