Work piphw – main dam package – additional works – investigation, survey, preparation of designs & drawings etc. <br /> construction of rcc diaphragm wall end cutoff for spill channel & vibro stone columns and deep soil mixing in gap ii. <br /> construction of ecrf dam gap-i including diaphragm wall cur off vibro stone columns and deep soil mixing, concrete dam gap-ii. <br /> slop protection works on both sides of spillway and spill channel etc of irrigation project.
Work piphw – main dam package – additional works – investigation, survey, preparation of designs & drawings etc.
construction of rcc diaphragm wall end cutoff for spill channel & vibro stone columns and deep soil mixing in gap ii.
construction of ecrf dam gap-i including diaphragm