Design, supply, installation, testing and commissioning of dual fuel (LDO & GAS) fired 1 x 30 TPH (F&A) 100 deg. C. design pressure 21.5 kg / cm2, 3 pass fire tube wet back Bi drum boiler for banas dairy on turnkey basis.
Design, supply, installation, testing and commissioning of dual fuel (LDO & GAS) fired 1 x 30 TPH (F&A) 100 deg. C. design pressure 21.5 kg / cm2, 3 pass fire tube wet back Bi drum boiler for banas dairy on turnkey basis.
Boiler Tenders, Gases Tenders, Steel Tube Tenders