Drilling, excavation, loading, transportation, dumping, spreading & levelling etc., of 722.176 lbcm of in-situ overburden (which includes 3.982 lbcm of top soil, 7.715 lbcm of bc soil, 692.993 lbcm of hard ob & 17.486 lbcm of coal) with conventional equipment and additional works viz., 1500 shovel hours, 500 dozer hours & 75,000 rmt drilling at srirampur opencast - i&ii integrated project, srirampur area during a period of 48 months. at Hyderabad,Telangana,India
Classified in :
#Transportation
#Drilling
#Excavation
#Metal Spreading
Key Values
Worth | : | ₹ 3554900000.0 |
EMD | : | Refer Document |
Doc Fees | : | ₹ 29500.0 |
Key Date
Due on | : | 06-Jul-2022 |
Days to go | : | -1091 Days |
Opening on | : | 06-Jul-2022 |
Published on | : | 16-Jun-2022 |
Key Location
Location | : | Hyderabad,Telangana,India |
Address | : |
![]() |