Converting 13 chiller chambers to controlled atmosphere (ca) chambers along with repairing and commissioning of ICA panel, CO2 scrubber, nitrogen plant, pneumatic valves. <br /> Replacement of cooling coil of evaporating /AHU units including sealing of chambers etc. complete as required for CA chamber operation at CA stores
Converting 13 chiller chambers to controlled atmosphere (ca) chambers along with repairing and commissioning of ICA panel, CO2 scrubber, nitrogen plant, pneumatic valves.
Replacement of cooling coil of evaporating /AHU units including sealing of chambers etc. complete as required for CA
Chemical Machinery Tenders, Civil Work Tenders, Coil Tenders, Control Panel Tenders, Sealing Machine Tenders, Valve Tenders