Consultancy services tar authority, engineer for supervision of rehabilitation and up-gra.tion for following roads. <br />* pkg-(1) narmatlapuram — gparrya road from km 61.900 km/ 78 months 0950 of existing narmadapuram bypass to km 187.25 81 pftftlriya (sh67) excluding existing km 254.00 to 220.39 cr. (18-month construction km 245.100 (design length 61.900 km) to two g. with paved shoulder on engineering, procurement & construction (epc) mode. <br />* pkg-(2) construction of elevated corridor an rawen —rahafgarh (sh-29, sh-29a & sh-62) road tram km 129/10 to km 139/2 (design ch. 80250 to ch. 92.355, design length 9.105 km) on engineering, procurement 9.105 km/ 147.87 cr. 144 months (24_rno„)), construction period + 120-month 10.00 30,000/- &construction (epc) mode. <br />* pkg-(3) 2-lane wrth paved shoulder of rena-beohan- tetka mod section of sh-57 (from ch. 0.00 to 18.55 km, construction of baghwar-canal bridge from ch. 32.80 to 33.00 km and ch. 40.45 to 111.50 co. design length 9000 km/ 352.81 cr. 84 months (24-month construction period + 60-month 9100 km.) on engineering, procurement &construction (epc) mode. <br />* consultancy services for prepar.ion of feasibility report of south-western bhopal ring road.
Consultancy services tar authority, engineer for supervision of rehabilitation and up-gra.tion for following roads.
* pkg-(1) narmatlapuram — gparrya road from km 61.900 km/ 78 months 0950 of existing narmadapuram bypass to km 187.25 81 pftftlriya (sh67) excluding existing km 254.00 to 220.39
Consultancy Service Tenders, Man Power Tenders, Road Tenders