Scr construction organisation nadikudi - srikalahasti new bg line project - balance left over works of construction of major bridges i.e., i) br.no.103 at ch.76611m as 2x12x6.0 rcc box(rub), ii) br.no.105 at ch.76982m as 10x12.20m psc girder on open foundation, iii) br.no.144 at ch.96850m as 2x12.20m psc girder (superstructure), iv) br.no.146 at ch.98424m as 1x18.30m skew psc 'u' girder (superstrucure), v)br.no.173a at ch.115000m as 1x24.00m composite girder (rob)on open foundation, vi)br.no.179 at ch.120575m as 4x12.2m psc girder on pile foundation, vii)br.no.180 at ch.121830m as 2x12.2m psc slab(rub) on open foundation, viii)br.no.181 at ch.122681m as 2x9.15m psc slab(rub) on open foundation, ix)br.no.204 at ch.141350m as 3x18.3m psc girder on open foundation, x)br.no.210 at ch.149915m as 2x12.2m psc slab (rub)on open foundation, xi)br.no.216 at ch.154754m as 1x12.2m psc girder (rub) on open foundation including earthwork in formation for bridge approaches, protective works and miscellaneous works at major bridge locations from ch.74700m to ch.155000m between existing gundlakamma(excl.) and proposed kanigiri (incl.) stations.
Scr Construction Organisation : Nadikudi - Srikalahasti New ......
Bridge Tenders, Foundation Tenders, R C C Product Tenders, Road Tenders, Track Work Tenders