Widening and improvement of existing 2-lane to 4-lane from Maranahalli (Design Km.236.000 Existing Km.237.000) to Addahole (Design Km.261.810, Existing Km. 263.0.500) (Shiradi Ghat) of Bangalore-Mangalore Section of NH-75 in Karnataka on EPC Mode
Widening and improvement of existing 2-lane to 4-lane from maranahalli (design km.236.000 existing km.237.000) to addahole (design km.261.810, existing km. 263.0.500) (shiradi ghat) of bangalore-mangalore section of nh-75 in karnataka on epc mode #*. widening and improvement of existing 2-lane to
Road Tenders