Construction of tunnel t1 (800 m length, ch km 106.825 to km 107.625), tunnel t2 (1775 m length, ch. km 108.225 to km 110.000) & tunnel t3 (2620 m length; ch. km 126.420 to km ch. 129.040) including bolt grouting & plate fixing for ohe and other allied works between daspalla & baniguchha station of khurda road-bolangir new bg rail link project on engineering, procurement & construction (epc) mode of east coast railways at Multi Location,Multi State,India
Classified in :
#Engineering Service
#Grouting
#Tunnel Work
#Overhead Equipment Work
#Rail Link
#Bolt
#Plate
Key Values
Worth | : | Refer Document |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 04-Apr-2023 |
Days to go | : | -822 Days |
Opening on | : | Refer Document |
Published on | : | 20-Feb-2023 |
Key Location
Location | : | Multi Location,Multi State,India |