Installation Work of 4000 Meters of 1 Phase 2 Wire (10-60 Ampere) Outside the Homes of Defective Meter Consumers and the Work of Getting the Inspection Report of Idf Done Through An External Agency.
Installation Work of 4000 Meters of 1 Phase 2 Wire (10-60 Ampere) Outside the Homes of Defective Meter Consumers and the Work of Getting the Inspection Report of Idf Done Through An External Agency.
Wire And Cable Tenders