Construction of lining of canal from Badewadi Tunnel to Wakurde Tank i.e. 2/290 to 2/650) length 360 m of Wakurde Lift Irrigation Scheme Part I, Stage II, Tal.Shirala, Dist..
Construction of lining of canal from Badewadi Tunnel to Wakurde Tank i.e. 2/290 to 2/650) length 360 m of Wakurde Lift Irrigation Scheme Part I, Stage II, Tal.Shirala, Dist.Sangli. #*. Construction of lining of canal from Badewadi Tunnel to Wakurde Tank i.e. 2/290 to 2/650) length 360 m of Wakurde
Canal Work Tenders