Sr.den/n/sbc section sw-i - baiyyappanahalli-dharmavaram section - construction of side drain between road1 and 2 at hindupur, cross drainage for road2 and 3 for 1000m and drain in yards 600m each at penukonda 1no, mlu 2nos, huo 1no. =2400m. total 3400m. sw-ii - bypl-dmm section - standardisation of sand hump at p-67 and p-68 at hindupur. sw-iii - bypl-dmm section - rail barricading at km 99/700-800 at approaches of rub. sw- iv - bypl-dmm section - providing and laying dry stone pitching in connection with balance doubling work in hindupur-penukonda section. sw-v - bypl-dmm section - construction of trolley refugee with release psc sleepers in connection with ctr (p) for a length of 0.4kms from 2/100-2/500 between krishnarajapuram-channasandra (kjm leg). maintenance period is 6months or one monsoon period whichever is later.
Sr.den/n/sbc Section: Sw-i - Baiyyappanahalli-dharmavaram Se......