Survey, Investigation, Design, Build, Operate And Transfer 43 MLD Capacity Sewage Treatment Plant (STP) And 20 KLD Fecal Sludge Co-Treatment Facility At Existing Salori STP Campus Along With Associate Infrastructure Including Interception, Diversion And Construction Of Drain Tapping Of 13 Nos Drains, Gravity Interceptor Trunk Sewer Line (2160 Mtr – Open Cut Method). <br /> Construction Of 02 Nos Sewage Pumping Station (SPS) 1 No. At Amitabh Bachhan Culvert- 32 Mld/40 Mld Capacity (Ultimate Year/Mid Year) & 1 No. At Sitaram Ghat - 3 Mld Capacity And 01 No. Effluent Pumping Station 43 Mld/ 60 Mld (Ultimate Year/ Mid Year) With Allied Works Including Rising Mains (4070 Mtr – Open Cut / Trenchless Method). <br /> Rehabilitation Of Existing Salori I&D Line (3300 Mtr From 900 mm To 1100 mm Dia) & Effluent Gravity Pipe Line (200 Mtr – Open Cut / Trenchless Method) And Effluent Rising Main (250 Mtr) With Operation And Maintenance Period Of 15 Years On Design Built Operate And Transfer (DBOT) Mode Under The Namami Gange Programme.
Survey, Investigation, Design, Build, Operate And Transfer 43 MLD Capacity Sewage Treatment Plant (STP) And 20 KLD Fecal Sludge Co-Treatment Facility At Existing Salori STP Campus Along With Associate Infrastructure Including Interception, Diversion And Construction Of Drain Tapping Of 13 Nos
Architectural Consultancy Tenders, Civil Work Tenders, Drainage Tenders, Invertor Tenders, Pipeline Project Tenders, Pump Tenders, Sewage Treatment Plant Tenders, Survey Work Tenders, Water Treatment Plant Tenders