Gadag-Hotgi Doubling Section 1. Construction of RUB in lieu of LC No.50 at Km. 101/806 Mugalolli yard as 1x5.0mx5.150m RCC Segmental boxes. 2.construction of RUB as 1x6.00x5.00m SQ(8.967SK) RCC segmental box bridges no.62E(RUB) at km.120.747 duly dismantling the existing 10.932m steel girder between sitamani & Kudalsangam Rd Stations. 3. construction of bridges No.62F at Km.120/947 of span 1x1.80x1.20m RCC box between sitamani & Kudalsangam Rd Stations. 4.Construction of bridge No.63C ROB at Km.128.940 of 60.00m Bow string girder duly dismantling the 21.80m clear span RCC T Beam slab at km.128.925 between Almatti and Wandal station
Gadag-hotgi Doubling Section: 1. Construction of Rub in Lieu......
Bridge Tenders, Dismantaling Work Tenders, R C C Slab Tenders