Biennial work contract for operation of effluent treatment plant and sewage treatment plant at WTP-11(800MW). <br /> Design, Manufacturing, supply, Replacement and fitment of seals for FO fan discharge dampers for Unit. <br /> Procurement of semi open Impeller submersible pumps for NOCT pond blow down at Unit No 6. <br /> In-Situ repairs of high pressure critical 2500 class valves and HP bypass valves and HP / IP control valves of TG Set. <br /> Supply and replacement of ESP hop, heaters. hopper heater packets during Unit-2 AOH. Partial replacement / restoration of bottom ash hopper mother plates, beams and channels with seal plates and seal through during Unit No.-1 AOH. <br /> Work of insitu repair a reconditioning of main steam outlet valves, critical valves during unit 2 . <br /> Procurement of ESP collecting plates of Unit.
Biennial work contract for operation of effluent treatment plant and sewage treatment plant at WTP-11(800MW).
Design, Manufacturing, supply, Replacement and fitment of seals for FO fan discharge dampers for Unit.
Procurement of semi open Impeller submersible pumps for NOCT pond blow
Effluent Treatment Plant Tenders, Heater Tenders, Pump Tenders, R C C Product Tenders, Seal Tenders, Sewage Treatment Plant Tenders, Valve Tenders