Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project Beacon BRO on EPC Mode at Baramulla,Jammu-Kashmir,India
Key Values
Worth | : | 4565500000.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 20-Jul-2023 |
Days to go | : | -722 Days |
Opening on | : | 21-Jul-2023 |
Published on | : | 07-Jun-2023 |
Key Location
Location | : | Baramulla,Jammu-Kashmir,India |
Address | : |
![]() |