Part Design and Construction of Elevated Viaduct and Six Elevated Stations (excluding Architectural finishing ) from Chainage 15017.00m to 25987.78m and including ramp for Depot entry of Bhubaneswar Metro Phase-I MRTS. at Bhubaneswar,Orissa (Odisha),India
Classified in :
#R C C Work
#Viaduct
#Tunnel Work
#Ramp
#Architectural Consultancy
#Civil Work
Key Values
Worth | : | 8697100000.0 |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 18-Jun-2024 |
Days to go | : | -378 Days |
Opening on | : | 19-Jun-2024 |
Published on | : | 13-Mar-2024 |
Key Location
Location | : | Bhubaneswar,Orissa (Odisha),India |
Address | : |
![]() |