Construction of Roadbed, Minor Bridges, Buildings, Installation of Track (excluding Supply of Rails, Sleeper & Thick Web Switches), and Other Civil Engineering and General Electrical Works in Connection with New Bg Railway Line Between Mangliyagaon - Kheri (incl) Stations (chainages 0.000 - 57.400 Km) in Indore-budni Section of Ratlam and Bhopal Divisions of Western Railway and West Central Railway Respectively in Madhya Pradesh State, India at Multi Location,Madhya Pradesh,India
Key Values
Worth | : | Refer Document |
EMD | : | Refer Document |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 25-Jul-2024 |
Days to go | : | -344 Days |
Opening on | : | Refer Document |
Published on | : | 15-May-2024 |
Key Location
Location | : | Multi Location,Madhya Pradesh,India |
Address | : |
![]() |