Requirement :
|
Surface Dressing Of The Ground Including Removing Small Plants, Bushes ,Vegetation (Dia Less Than 4") And Making Surface Levelled And Disposal Of Rubbish, Excavation In Earth, Excavation For Foundation Upto Required Depth Below Ground Level In Any Type Of Soil Except Hard Rock . Rate To Include Dressing The Sides And Bottom, Bailing Out Of Water If Encountered, Shoring, Strutting, Backfilling After The Construction Of Foundation, Foundation, Trenches/Plinth Beam Etc Compacting By The Side Of The Foundation And Disposal Of Surplus Excavated Earth Within/Outside Hpcl's Premises To An Unobjectionable Place,, Supply And Filling With Clean Silver / River Sand Of Approved Quality In Layers Of 150 Mm Each Including Spreading, Compacting By Hand Ramming And Watering, Supplying And Filling Good Quality Murum In Layers Of 150 Mm Thick Including Watering And Compacting Till Maximum Compaction Is Achieved, Murrum Filling, Earth Filling, Providing And Laying Pcc 124 Using 20 Mm And Down Size Graded Stone Aggregates Including Machine Mixing, Providing Formwork, Rrm Super Structure, Concrete Hollow Blocks, Rubble Solling 230 Mm Thk, Flush Pointing, Brick Pitching, Plastering 6 Mm Thk, Weep Holes, Structural Steel, Rectifiedtiles- Compound Wall, Ceramictile- 450mmx450mm, Granite Tile Flooring, Granite Slab18 Mm Black, Kota Stone Steps, Concrete Tile-Walkway, Chajja Water Proofing, Integral Terrace Waterproofing, Acrylicemulsion Paint, Supply, Installation And Fixing Of Prefabricated Ms Grill (Is 2062 Latest Edition) Using Ms Flat/Structurals / Bars / Hollow Sections / Strips / Pipes Etc.
|