Requirement :
|
Construction Of 11.5 Mld. Stp At Providing & Fixing Of Ci D/F Pipes, Ci Specials Such As Ci D/F Bends Tail Piece, All Flangs Tee, Blank Flangs Etc., Providing & Fixing Ci D/F Non Return Valve, Ci D/F Butterfly Valve Of 250mm I/D & 400 Mm I/D Along With Nut Bolt & Other Jointing Material At Mps Shahbad And All Other Works Contingent There To Up Gradation And Commissioning After Conversion Of Existing 7 Mld Capacity Sewage Treatment Based On Moving Bed Biological Reactor Technology (attached Growth Process) To Combined Activated Sludge Process In Conjunction With Mbbr Bio Film Process With Addition Of, Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps With Tertiary Treatment Based On Deep Bed Filters Followed By Chlorination In Existing Stp Complete In All Respect With Plc, With Data Transfer Through Modem To Website, Dg Set & Transformer For Additional Capacity And All Other Works Contingent Thereto Including Operation And Maintenance For During Up-Gradation Period And 3 Months Of Trial Run Period, 12 Month Defects Liability Period After And 5 Years Thereafter On The Commissioning Of Up Gradation Stp I.E. Completion Of Tertiary Treatment Plant At Ladwa Town
|