Requirement :
|
Lstk1 Package For Ethylene Glycol Project At Iocl Paradip Consistency Checks, HAZOP study, Residual Basic Engineering, Detailed Engineering including design , Project Management, site enabling jobs, Topography survey and Soil Investigation, Total Procurement (including catalysts and chemicals), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Storage of all Equipment, Materials, items and other Construction Materials, Construction Management & Supervision, Construction and Installation, installation of Tie-in points of Piping, Instrumentation, Electrical, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance and CRZ which shall be obtained by OWNER) Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning assistance and Performance Guarantee Test Runs contract closure activities including Final invoice / billing and document hand over and handing over the entire Plant including spares with Final and “As Built” documentation to OWNER on single point responsibility basis (Lump Sum Turn Key – LSTK Basis), at Paradip Refinery, Paradip, Odisha.
|