Requirement :
|
Construction of 1.637 km long bhadbhut barrage comprising of river diversion work, construction of 2 nos of 3 lane and 2 nos of 2 lane bridges over barrage piers including approaches (flank walls) and approaches road, hydro mechanical and Electro mechanical work for 90 nos of 15.50 M (W)x10.50M (H), fixed wheel type vertical lift, gate, rope drum type hoists and moving gantries with trestles for U/s and D/s stoplogs, barrage instrumentation, navigation channels with navigation locks for fishermen’s boats, fish passage, adequate drainage arrangement on both the banks of narmada river, power evacuation and distribution up to 33kv/22kv/11 kv etc under phase I development programme.
|